top of page

Post-Competition Analysis

What went wrong:

  • During our inspection, we were asked to move our killswitch. Later, we realized that our killswitch was broken.

  • It should’ve been the first thing we checked since it was a modification we made.

  • Our gear basket was not very efficient

  • Should have been improved after last competition.

  • Not enough weight on our robot, our centre of gravity was too high.

  • We were not ready to match the level of competition and aggressiveness of the other teams competing

What went right:

  • We fixed the killswitch

  • had a better safety program: Handed out safety kits

  • Good communication and connections with other teams

  • We made a variety of pins for other teams!

  • Had a good pit setup

  • Brought the right tools

  • Improved our winch;

  • Made it faster

  • Easier to climb

  • Less room for error

Analysis:

  • Communication between the team can be improved by having a meeting after every competition and showing what each team accomplished by using a board or padlet to track what each section is doing.

  • For example, if the driver wants changes he should voice this to the programmer and if the programmer makes changes, he should let them know.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Instagram Social Icon
bottom of page